BEGIN:VCALENDAR PRODID:-//Microsoft Corporation//Outlook 16.0 MIMEDIR//EN VERSION:2.0 METHOD:PUBLISH X-MS-OLK-FORCEINSPECTOROPEN:TRUE BEGIN:VTIMEZONE TZID:Central Standard Time BEGIN:STANDARD DTSTART:16011104T020000 RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11 TZOFFSETFROM:-0500 TZOFFSETTO:-0600 END:STANDARD BEGIN:DAYLIGHT DTSTART:16010311T020000 RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3 TZOFFSETFROM:-0600 TZOFFSETTO:-0500 END:DAYLIGHT END:VTIMEZONE BEGIN:VEVENT CLASS:PUBLIC CREATED:20240321T020803Z DESCRIPTION:3:20-3:50 PM\n\nThe Stakes are High: Emergency Lift Station Reh abilitation in a World Heritage Site\n\nThe Acequia Lift Station is locate d in the San Antonio Missions National Historic Park\, a part of San Anton io that is classified as a World Heritage site. It is also the largest lif t station in the SAWS wastewater system and\, with 35 years of service\, i s in need of rehabilitation. This presentation will discuss how Garver is assisting SAWS in the accelerated repair needs\, specific challenges and i ssues that have been identified during the process\, and project-specific accommodations that have been implemented to preserve environmentally or c ulturally sensitive areas.\n\nSpeakers: Project Engineer Elizabeth Lara\nI nfrastructure Design Team Leader Michael Salinas\, PE\n\n \n\n DTEND;TZID="Central Standard Time":20240411T155000 DTSTAMP:20240321T020803Z DTSTART;TZID="Central Standard Time":20240411T152000 LAST-MODIFIED:20240321T020803Z LOCATION:204 A PRIORITY:5 SEQUENCE:0 SUMMARY:Join Garver’s Texas Water Presentation! The Stakes are High: Emer gency Lift Station Rehabilitation in a World Heritage Site TRANSP:OPAQUE UID:3Gb2oFchEEynQY/uhCX93A== X-ALT-DESC;FMTTYPE=text/html:

3:20 -3:50 PM

The Stakes are High: Emergency Lift Station Rehabili tation in a World Heritage Site

The Acequia Lift Station is located in the San Antonio Missions National Historic Park\, a part of San Antonio that is classified as a World Heritage site. It is also the la rgest lift station in the SAWS wastewater system and\, with 35 years of se rvice\, is in need of rehabilitation. This presentation will discuss how G arver is assisting SAWS in the accelerated repair needs\, specific challen ges and issues that have been identified during the process\, and project- specific accommodations that have been implemented to preserve environment ally or culturally sensitive areas.

Speakers: \;< /b>Project Engineer \;Elizabeth LaraInfrastructure Design Team Leader \;Michael Salinas\, PE

 \;

X-MICROSOFT-CDO-BUSYSTATUS:BUSY X-MICROSOFT-CDO-IMPORTANCE:1 X-MICROSOFT-DISALLOW-COUNTER:FALSE BEGIN:VALARM TRIGGER:-PT15M ACTION:DISPLAY DESCRIPTION:Reminder END:VALARM END:VEVENT END:VCALENDAR