BEGIN:VCALENDAR PRODID:-//Microsoft Corporation//Outlook 16.0 MIMEDIR//EN VERSION:2.0 METHOD:PUBLISH X-MS-OLK-FORCEINSPECTOROPEN:TRUE BEGIN:VTIMEZONE TZID:Central Standard Time BEGIN:STANDARD DTSTART:16011104T020000 RRULE:FREQ=YEARLY;BYDAY=1SU;BYMONTH=11 TZOFFSETFROM:-0500 TZOFFSETTO:-0600 END:STANDARD BEGIN:DAYLIGHT DTSTART:16010311T020000 RRULE:FREQ=YEARLY;BYDAY=2SU;BYMONTH=3 TZOFFSETFROM:-0600 TZOFFSETTO:-0500 END:DAYLIGHT END:VTIMEZONE BEGIN:VEVENT CLASS:PUBLIC CREATED:20240321T021402Z DESCRIPTION:9:05-9:35 AM\n\nFriendswood Resilience: An Operations-Driven Ma ster Planning\n\nThe City of Friendswood embarked on a master plan to impr ove the resiliency and service for the water system\, focused on improving resiliency through distribution system improvements\, neighboring utility agreements\, and operation troubleshooting. This presentation will discus s the synergy that can be achieved through holistic system solutions. Buil ding resiliency into the system is the product of physical improvements\, cooperative agreements\, and reevaluating “standard” procedures.\n\nSp eaker: Southeast Texas Team Leader Wade Parks\, PE\, CFM\n\n \n\n DTEND;TZID="Central Standard Time":20240412T093500 DTSTAMP:20240321T021402Z DTSTART;TZID="Central Standard Time":20240412T090500 LAST-MODIFIED:20240321T021402Z LOCATION:203 B PRIORITY:5 SEQUENCE:0 SUMMARY:Join Garver’s Texas Water Presentation! Friendswood Resilience: A n Operations-Driven Master Planning TRANSP:OPAQUE UID:Umn5R0vIHE2KE8p/7g+13w== X-ALT-DESC;FMTTYPE=text/html:

9:05 -9:35 AM

Friendswood Resilience: An Operations-Driven Master Planning

The City of Friendswood embarked on a master pla n to improve the resiliency and service for the water system\, focused on improving resiliency through distribution system improvements\, neighborin g utility agreements\, and operation troubleshooting. This presentation wi ll discuss the synergy that can be achieved through holistic system soluti ons. Building resiliency into the system is the product of physical improv ements\, cooperative agreements\, and reevaluating “\;standard”\ ; procedures.

Speaker: \;Southeast Texas Team Leader \;Wade Parks\, PE\, CFM

 \;

X-MICROSOFT-CDO-BUSYSTATUS:BUSY X-MICROSOFT-CDO-IMPORTANCE:1 X-MICROSOFT-DISALLOW-COUNTER:FALSE BEGIN:VALARM TRIGGER:-PT15M ACTION:DISPLAY DESCRIPTION:Reminder END:VALARM END:VEVENT END:VCALENDAR